Difference between revisions of "Eureka Hill Railway"

From PacificNG
(Created page with "==History== <span style="float:right;">__TOC__</span> <span class="paracap">T</span>he Eureka Hill Railroad was begun in 1907 and completed in early 1908. It was built to tran...")
 
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[Narrow Gauge Railroads of Utah|Utah]] / [[Narrow Gauge Railroads of Utah#Mining|Mining]] / [[Eureka Hill Railway]]
==History==
==History==
<span style="float:right;">__TOC__</span>
<span style="float:right;">__TOC__</span>
<span class="paracap">T</span>he Eureka Hill Railroad was begun in 1907 and completed in early 1908. It was built to transport ore from mines on Eureka Mountain to the new smelter at Silver City, Utah. It was seven miles long, had one 28 ton and three 70 ton Shays. Rolling stock consisted of twenty-two wood ore cars, former Colorado & Northwestern Railway, and forty steel ore cars built by Kilbourne & Jacobs.
<span class="paracap">T</span>he Eureka Hill Railroad was begun in 1907 and completed in early 1908. It was built to transport ore from the Knight Investment Company mines on Godiva Mountain in the Tintic Mining District to the new smelter at Silver City, Utah. It was seven miles long, had one 28 ton and three 70 ton Shays. Rolling stock consisted of two wood flatcars, twenty-two wood ore cars (former Colorado & Northwestern Railway) and forty steel ore cars built by Kilbourne & Jacobs.


----
----
Line 7: Line 9:


== Reference Material Available Online ==
== Reference Material Available Online ==
[https://utahrails.net/utahrails/eureka-hill-1907-1937.php Eureka Hill Railway page on UtahRails].
[https://www.google.com/maps/d/viewer?mid=1R40oXHCcRNXrqIhrN2xUaDwC9Gg&ll=40.13833425869331%2C-111.94119060000003&z=10 Google Map of the Eureka Hill Railway and surrounding standard gauge railroads].


=== Maps ===
=== Maps ===
Line 13: Line 20:
[[Narrow Gauge Railroads of Utah|Utah]] / [[Narrow Gauge Railroads of Utah#Mining|Mining]] / [[Eureka Hill Railway]]
[[Narrow Gauge Railroads of Utah|Utah]] / [[Narrow Gauge Railroads of Utah#Mining|Mining]] / [[Eureka Hill Railway]]


[[Category:36in Gauge Railroads]] [[Category:Copper]]
[[Category:36in Gauge Railroads]] [[Category:Silver]]

Latest revision as of 16:32, 30 November 2021

Utah / Mining / Eureka Hill Railway

History

The Eureka Hill Railroad was begun in 1907 and completed in early 1908. It was built to transport ore from the Knight Investment Company mines on Godiva Mountain in the Tintic Mining District to the new smelter at Silver City, Utah. It was seven miles long, had one 28 ton and three 70 ton Shays. Rolling stock consisted of two wood flatcars, twenty-two wood ore cars (former Colorado & Northwestern Railway) and forty steel ore cars built by Kilbourne & Jacobs.



Reference Material Available Online

Eureka Hill Railway page on UtahRails.

Google Map of the Eureka Hill Railway and surrounding standard gauge railroads.


Maps

Utah / Mining / Eureka Hill Railway