BLW-CN4214-1877
History
South Pacific Coast Railroad #4 was built by the Baldwin Locomotive Works in 1877.
Specifications
| Baldwin Class | 8-18 1/2C-3 |
| Whyte | 4-4-0 |
| UIC | 2′B n |
| Gauge | 3 ft (914 mm) |
| Driver Dia. | 42 in (1,067 mm) |
| Loco weight | 22.75 short tons (20.6 t) |
| Fuel Type | Wood |
| Boiler Pressure | ?? psi (?? MPa) |
| Cylinders | Two, outside |
| Cylinder Size | 12 in × 18 in (300 mm × 457 mm) |
Service
South Pacific Coast
Ordered by the South Pacific Coast Railroad in August 1877. Placed in service February 1878. Transferred to the South Pacific Coast Railway May 1887.

