Search results
From PacificNG
- ...built by that builder will be generated. A list of detail sheets of those locomotives will also be included. :[[:Category:Baldwin Locomotives|Baldwin Locomotives]]2 KB (207 words) - 09:59, 5 August 2021
- ====Locomotives==== :1 - 0-4-0T Vulcan Locomotive Works, c/n 1138, 7/1907, 36 in gauge, 6”x10”, 24” drivers.883 bytes (98 words) - 14:08, 20 August 2021
- ...ctor [[Erickson & Peterson Construction Company]]. Numbered 23 and 24. The locomotives had been used in the double tracking of [[Southern Pacific]]’s Donner Pas ...ve arrived in Sheridan that May. After the arrival of the Shay, the Vulcan locomotives were stored.4 KB (689 words) - 17:23, 2 October 2020
- ...given to [[Stone & Webster]] who brought in a pair of Vulcan built 0-4-0T locomotives. The 30" gauge Porter was of no use to the new railroad and left unused dur2 KB (278 words) - 08:04, 20 March 2023
- ...e cranes. This was the only standard gauge operation on Oahu. The order to Vulcan also included one 3-foot gauge locomotive for the Shipyard. Freight cars we ...for locomotives and all types of freight cars. By war's end 23 new diesel locomotives had been received by the Navy as well as hundreds of freight cars of all ty6 KB (974 words) - 18:11, 10 April 2021